# High Park Century Oak Staircase Restoration ($6.4K) | Toronto

> Case study: full strip and restoration of a 1912 quarter-sawn oak staircase in High Park, Toronto. Price, timeline, dustless sanding, stain match.

URL: https://staircaserailingstoronto.ca/projects/high-park-century-oak-staircase-refinish/
Last-Modified: 2025-05-14
Author: Staircase Railings Toronto

Toronto Staircase Refinishing May 2025

# High Park Century Oak Staircase Full Strip and Restoration

Full strip and restoration of a century-old quarter-sawn oak staircase in a High Park Edwardian: dustless sanding, stain match to original 1912 trim, two coats of oil-modified polyurethane, newel post stripped and re-waxed.

Price

$6,400

Timeline

7 working days on site

Client

Residential, heritage home

![Before photo of worn orange-toned oak stair treads with scratches and water rings](/images/misc/before-worn-orange-toned-oak-stair-treads-with-scr.webp)

In fabrication

![Century-old oak staircase in a High Park Edwardian home after full strip and restoration](/images/misc/century-old-oak-staircase-after-full-strip-and-res.webp)

Final install

## The scope

A High Park homeowner called about a 1912 Edwardian with the original quarter-sawn oak staircase, a turned newel, and matching handrail that had been stained, re-stained, and poly-coated for a century. The treads were orange, scratched, and ringed. We quoted a full strip with our dustless Festool-connected system, stain match to the original 1912 window trim, two coats of oil-modified polyurethane, and a full strip and re-wax on the turned newel.

## The timeline

Seven working days on site, no shop fabrication required. Day 1 and 2 for dustless strip of all 14 treads, risers, stringers, and the full handrail. Day 3 for stain match sample boards and client approval. Day 4 to apply the matched stain. Day 5, 6, and 7 for two coats of poly with 24-hour cure between coats, and the newel strip and wax.

## The outcome

The homeowner can see the original oak grain and quarter-sawn ray pattern for the first time since they bought the house in 2008. Price landed at $6,400 all in, no change orders. We left no dust in the house because of the dustless system.

More Projects

## Other Staircase and Railing Case Studies

![Black powder-coated aluminum deck railing with clear tempered glass infill panels on a Kingsway second-storey deck](/images/misc/black-aluminum-railing-with-clear-glass-panels-on-.webp)

Etobicoke September 2025

### Kingsway $11,200 Aluminum + Glass

$11,200 View →

[Kingsway $11,200 Aluminum + Glass →](/projects/kingsway-aluminum-glass-deck-railing/)

![Lakefront deck in Mimico with marine-grade 316 stainless posts and frameless 15mm laminated glass panels](/images/misc/lakefront-deck-with-316-stainless-posts-and-framel.webp)

Etobicoke October 2025

### Lakeshore $24,500 Stainless + Glass

$24,500 View →

[Lakeshore $24,500 Stainless + Glass →](/projects/lakeshore-316-stainless-glass-dock-rail/)

![Frameless 15mm laminated glass railing with brushed 316 stainless top rail along a Lawrence Park landing](/images/misc/frameless-15mm-glass-railing-with-brushed-316-stai.webp)

North York August 2025

### Lawrence Park $18,500 Frameless Glass

$18,500 View →

[Lawrence Park $18,500 Frameless Glass →](/projects/lawrence-park-frameless-glass-railing/)

## Thinking About a Project Like This?

Shop drawings and a written CAD quote within 5 business days. 22 years of GTA custom fabrication, OBC Section 9.8 and 3.4 compliance.

Request a CAD Quote

[/contact/ →](/contact/)

 

Call (437) 524-2993

[tel:+14375242993 →](tel:+14375242993)
