# Before and After: Custom Staircase and Railing Fabrication | Staircase Railings Toronto

> Before and after photos of our custom staircase and railing fabrication: curved oak staircases, frameless glass, wrought iron, aluminum, 316 stainless, commercial feature stairs. Filter by city.

URL: https://staircaserailingstoronto.ca/gallery/

Fabrication to Install

# Custom Staircase and Railing Fabrication Gallery

Shop fabrication alongside final site install for every project we photograph. Curved oak, frameless glass, hand-forged wrought iron, aluminum, 316 stainless, and commercial steel. Filter by city.

Request a CAD Quote

[/contact/ →](/contact/)

 

Call (437) 524-2993

[tel:+14375242993 →](tel:+14375242993)

 

Toronto - Yorkville curved white oak staircase

A Yorkville penthouse owner wanted a curved staircase sweeping into the main living space with no visible structure. We laminated eight white oak layers into the stringer, cut and installed 15 radiused treads, and set frameless 15mm glass on brushed stainless spigots. Fabrication took three weeks; install, four days.

In fabrication

Final install

North York - Lawrence Park frameless glass

This Lawrence Park family wanted an upper landing guard that would not block the sightline from the kitchen to the yard. We fabricated 15mm clear tempered glass panels with a continuous brushed 316 stainless top rail, base-shoe mounted. Published CAD estimate: $4,800 for 14 linear feet. Installed in one day.

In fabrication

Final install

North York - Willowdale oak treads with iron

A Willowdale split-level renovation included new red oak treads on three half-flights plus a complete swap from turned-wood spindles to slim matte black iron pickets. The homeowner kept the original handrail; we refinished it in dark walnut and reset every picket into drilled pockets with two-part epoxy. Three days on site.

In fabrication

Final install

Etobicoke - Kingsway aluminum and glass deck

A Kingsway owner needed a backyard deck guard that met OBC 9.8 but did not look like a condo balcony. We fabricated black powder-coated aluminum posts with clear tempered glass infill panels, cedar top cap, and self-closing gate. Twenty-two linear feet, installed in two days. Written workmanship warranty.

In fabrication

Final install

Etobicoke - Mimico 316 stainless and glass

For a Mimico lakefront home, we specified 316 marine-grade stainless (not 304) because of the direct salt-air exposure off Lake Ontario. Frameless 15mm panels on structural posts, no top rail, so the water view stays unobstructed. Installed over two days. Guaranteed against pitting corrosion.

In fabrication

Final install

Toronto - High Park century oak refinish

A 1912 Edwardian in High Park came to us with the original quarter-sawn oak staircase coated in a century of urethane. We did a seven-day full strip with our dustless Festool system, stain-matched to the 1912 window trim, and finished with two coats of oil-modified polyurethane. $6,400 all in, no change orders.

In fabrication

Final install

Mississauga - Port Credit full replacement

This Port Credit homeowner replaced an entire 1990s builder-grade staircase with new white oak treads, custom handrail, and slim matte black iron pickets. The old spindles were loose; the new install is set in two-part epoxy with baluster shoes, warranted against rattle. Five working days.

In fabrication

Final install

Vaughan - VMC commercial steel feature stair

The VMC commercial feature staircase connects two office floors in a Vaughan Metropolitan Centre tower. Custom HSS stringers in matte black powder coat, solid walnut treads with hidden LED underlighting, frameless glass guard. Shop drawings in week one, fabrication over three weeks, two-day install at off-hours. Signed off by city inspector on first visit.

In fabrication

Final install

Markham - Unionville hand-forged wrought iron

A Unionville heritage home needed an exterior porch railing with period-correct scrollwork. We hand-forged custom scroll panels in our shop, finished in antique bronze with a hand-waxed patina. Limestone-trimmed install over three days. The owner matched a 1920s photo of the original railing from the archives.

In fabrication

Final install

Oakville - Bronte basement L-shape oak

An Oakville family needed a basement staircase that could handle wet boots and daily traffic without squeaking in year two. We rebuilt the structure with new 2x12 stringers and installed solid red oak treads with a mid-landing, oak handrail, slim matte black pickets. Six days total. No change orders.

In fabrication

Final install

Toronto - Downtown cantilevered glass stair

This downtown Toronto penthouse owner wanted a staircase that looked like it was floating. We engineered a hidden steel sub-structure, cantilevered white oak treads from the feature wall, and set frameless 15mm glass on structural spigots with a brushed stainless top rail. Engineered to OBC 9.8 Table 9.8.8.2. Four weeks shop, five days install.

In fabrication

Final install

Etobicoke - Humber Bay rooftop guard

Humber Bay rooftop terrace guard, needed to meet the 42-inch condo-code height while preserving the water view. 316 stainless posts with frameless 15mm glass infill, composite top cap, mechanically anchored through the membrane with manufacturer-approved sleeves. Thirty-eight linear feet. Install done in a single day without disrupting the suites below.

In fabrication

Final install

Toronto - Rosedale brushed brass + frameless glass

For a Rosedale heritage mansion, the homeowner wanted the warmth of brass but the clear sightline of glass. We fabricated a continuous brushed brass top rail over frameless 15mm clear panels, refinished the original white oak treads in dark walnut, and restored the period wainscoting. $18,900 for the complete staircase + landing. Six weeks start to finish.

In fabrication

Final install

Toronto - Forest Hill stainless cable rail

A Forest Hill owner wanted the open loft feel of cable rail but the material quality to last outdoors on the balcony-adjacent landing. 316 stainless cable between powder-coated matte black posts, swaged fittings, tensioned to 400 lb per cable. Solid walnut treads refinished on site. Three-day install, no measurable deflection at the mid-post 12 months later.

In fabrication

Final install

North York - Bridle Path hand-forged curved iron

A Bridle Path estate owner asked for a grand curved staircase in the style of a European manor. We hand-forged custom wrought iron scroll panels on our shop jig, finished in antique bronze, mounted along a custom-bent dark walnut handrail. Nine weeks shop fabrication. The install itself took four days because every scroll panel is hand-fitted.

In fabrication

Final install

Toronto - Casa Loma restored Victorian wrought iron

The original 1909 wrought iron on this Casa Loma heritage property had been painted twelve times. We stripped it to bare metal, re-forged two broken scroll sections to match, finished in a hand-waxed black patina. The original turned-wood newel was restored, not replaced. Heritage approval came back in two weeks; the restoration took four.

In fabrication

Final install

North York - Hoggs Hollow floating open-riser

This Hoggs Hollow modern home needed a staircase that would be the central visual element from every angle. We hid a steel sub-structure in the feature wall, cantilevered white oak treads with no visible fasteners, and set frameless 15mm glass guard on structural spigots. $32,400. Engineering drawings in week one, install in four days.

In fabrication

Final install

Toronto - King West penthouse cable rail

A King West penthouse owner replaced a dated metal spindle railing with a brushed 316 stainless cable system between matte black posts. We re-threaded the staircase run and the upper landing in one day. Cables tensioned to spec, swage fittings concealed. The owner wanted no view obstruction between the staircase and the skyline window wall.

In fabrication

Final install

Toronto - Yorkville steel mono-stringer

A Yorkville condo loft owner wanted the industrial look of a single steel beam carrying the full staircase. We fabricated the matte black powder-coated mono-stringer in our Etobicoke shop, cut rift-sawn white oak treads for warmth, and set frameless 15mm glass guard on the open side. Engineering to OBC 9.8. Three-week lead time, two-day install.

In fabrication

Final install

Toronto - Leslieville semi oak + slim black iron

A Leslieville Victorian semi renovation needed a staircase that fit the modern interior but respected the home's bones. New solid white oak treads replaced the carpeted originals, slim matte black iron pickets replaced the chunky colonial spindles. Four days on site. The exposed brick wall stayed; the staircase changed completely.

In fabrication

Final install

Toronto - Playter Estates century home modern pickets

A Playter Estates century home kept its original 1910 oak staircase (we refinished it in deep walnut) but swapped the turned-wood spindles for slim matte black iron pickets. The homeowner wanted the modern/traditional contrast. Period newel post was fully restored, not replaced. Three days on site. $5,200.

In fabrication

Final install

Toronto - Cabbagetown Victorian + modern glass

This Cabbagetown Victorian townhouse owner asked for a glass railing update that would not fight the period details. Frameless 15mm clear panels on brushed stainless spigots along the original restored oak staircase. Original turned newel post retained and refinished. The modern glass sits inside the Victorian frame without competing with it.

In fabrication

Final install

Etobicoke - The Kingsway curved walnut handrail

A Kingsway luxury home curved staircase needed a continuous handrail following the sweep without any visible joints. We custom-bent solid walnut on a shop jig, hand-rubbed the finish, and installed over slim matte black iron pickets. Shop drawings approved in three days; the handrail bend took two weeks; install, one day. $14,800 for the handrail work alone.

In fabrication

Final install

Toronto - Riverdale duplex glass balcony guard

A Riverdale duplex renovation included a juliet balcony overlooking the main living space below. We fabricated a frameless 15mm clear glass panel with a brushed stainless base shoe, structurally fastened through the floor plate. Twelve linear feet, one-day install. OBC Section 9.8 compliant for interior guards.

In fabrication

Final install

## Thinking About a Custom Fabrication?

Shop drawings and a written CAD quote within 5 business days. 22 years of GTA fabrication, OBC Section 9.8 and 3.4 compliance.

Request a CAD Quote

[/contact/ →](/contact/)

 

Call (437) 524-2993

[tel:+14375242993 →](tel:+14375242993)
